Method of deepening a canal. A number of holes are drilled close together on bed and the spoil is put the barge accompanying the drilling rig. If current was not strong enough to level out the bed of the waterway, a scraper or drum was used to do the work. The process could also be carried out by two men (L) before canal was flooded. From Architecture Hydraulique by Bernard Forest de Belidor (Paris, 1737). Engraving.

px px dpi = cm x cm = MB
Details

Creative#:

TOP09159546

Source:

達志影像

Authorization Type:

RM

Release Information:

須由TPG 完整授權

Model Release:

NO

Property Release:

NO

Right to Privacy:

No

Same folder images:

Same folder images