In order to minimise the risk of floods between Walton on Thames and Weybridge in Surrey workmen are cutting a channel across a band of the River Thames - the Channel will divert the river and provide an outlet for the surplus water which comes down in flood time - while workmen are digging the channel a man is constantly at work pumping water from the excavations - photo shows a general view of the work in progress at Weybridge showing Thames on right and the new Walton Bridge and channel on left February 2nd 1935

px px dpi = cm x cm = MB
Details

Creative#:

TOP19174178

Source:

達志影像

Authorization Type:

RM

Release Information:

須由TPG 完整授權

Model Release:

No

Property Release:

No

Right to Privacy:

No

Same folder images:

Same folder images