In order to minimise the risk of floods between Walton on Thames and Weybridge in Surrey workmen are cutting a channel across a band of the River Thames - the Channel will divert the river and provide an outlet for the surplus water which comes down in flood time - while workmen are digging the channel a man is constantly at work pumping water from the excavations - photo shows a general view of the work in progress at Weybridge showing Thames on right and the new Walton Bridge and channel on left February 2nd 1935
px | px | dpi | = | cm | x | cm | = | MB |
Details
Creative#:
TOP19174178
Source:
達志影像
Authorization Type:
RM
Release Information:
須由TPG 完整授權
Model Release:
No
Property Release:
No
Right to Privacy:
No
Same folder images: